recent projects
Projects
Investing in a sustainable energy future
We have successfully implemented several projects in recent years. Each project is individually supervised by us.
Your requirements and all influencing factors are taken into account during planning. Count on our experience.
For detailed information on our reference projects, we look forward to hearing from you.
3 plants wp2.150
Nahwärme Vorchdorf e.Gen.
Austria / Upper Austria
Operation of District Heating Network
Nahwärme Vorchdorf is celebrating its 15th anniversary this year in 2022. At the same time, the expansion project, the new wood gas plants, are opened.
The facilities in Vorchdorf supply around 900 family homes with heat. The new wood gas plants will generate electricity for around 850 family homes.
- Plants
3 x wp2.150
- Date of commissioning
June 2022
- Electrical output
480 kW
- Thermal output
870 kW
- Combustibles: standard wood chips
2 plants wp2.150
Ă–KO Energie Zauner
Austria / Upper Austria
Waste Disposal and Operation of District Heating Network
The company is active in waste disposal and has been operating a biogas plant for years. Since June 2022, a vee wood gas CHP plant for the generation of electricity and heat has been in operation. The district heating network in the Pettenbach area has a connected load > 3MW, the customers are private households and commercial enterprises.
– Waste disposal
– Wood chips and biomass (with drying)
– Organic fertilisers
– Electricity and heat generation
- Plants
2 x wp2.150
- Date of commissioning
June 2022
- Electrical output
300 kW
- Thermal output
580 kW
- Combustibles: standard wood chips
1 plant wp2.300
Reference Plant 300 kW, installed at a Disposal Company
Austria / Vorarlberg
Due to high demand for plants with higher output, the development of a wood gasifier with a combustion capacity of approx. 1 MW and a CHP with an electrical output of approx. 300 kW began in 2018. The prototype was commissioned at the beginning of 2021.Â
From this development, the sizes wp2.250 and wp2.350 are available as standard in the meantime.
- Plants
1 x wp2.300
- Date of commissioning
February 2021
- Electrical output
300 kW
- Thermal output
600 kW
- Combustibles: standard wood chips
2020
Austria / Vorarlberg
Biomass Facility
- 1 plant wp2.150
- biomass drying process
- electric power generation
2019 and 2022
Switzerland / Montreux
Agriculture and Forestry
- 2 plants wp2.050
- facility heating
- hay drying
- electric power generation
2019
Germany / Bavaria
Eco Energy Production
- 1 plant wp2.150
- district heating network
- electric power generation
2018
Germany / Bavaria
Agriculture and Forestry
Eco Energy Production
- 1 plant wp2.150
- biomass drying process
- electric power generation
2018
Austria / Vorarlberg
Brickwork Company
- 2 plants wp2.150
- brickwork drying process
- electric power generation
2018
Germany / Black Forest
Woodwork Company
- 2 plants wp2.150
- timber drying
- conversion of palm oil CHPs into woodgas CHPs
- electric power generation
2017
Germany / Allgäu
Agriculture and Forestry
- 1 plant wp2.050
- wood chip drying
- facility heating
- electric power generation
2014
Austria / Vorarlberg
Woodwork Company
- 1 plant wp2.150
- 1 plant wp2.050
- reference plants at the vee owners woodwork company