vee Wood Gasification Projects

Investing in a sustainable future

We have successfully implemented and commissioned several wood gas projects in recent years. Each project is individually managed by us according to your requirements and framework conditions.

For detailed information and visits to our references, we look forward to hearing from you.

Plants installed and in operation
0
New plants under construction 2025 / 2026
0
vee_team_en

Gräsalp biomass heating plant
AT / Vorarlberg

District Heating Network & Green Electricity

The Gräsalp biomass heating plant is relying on vee technology to expand the district heating network in the municipality of Schoppernau.

The district heating network has a length of approx. 3 km and 70 connections, supplying heat to hotels and businesses as well as the municipality and private households.

The new vacuum technology is being used for the first time in wood chip drying. The dryer is encapsulated, dust formation in the installation room is very low and the dryer achieves maximum efficiency with minimum power consumption.

1 x wp2.150

Dec. 2024

160 kW

290 kW

Nordwald Energie GmbH
AT / Lower Austria

District Heating Network & Green Electricity

Nordwald Energie is active in the business field of eco-energy generation and the operation of a district heating network using vee synthesis gas systems.

The district heating network has a length of approx. 8 km and 145 connections, with a total connected load of 3,500 kW. It is operated with 2 buffer storage tanks, 48,000 liters each, and a wood chip boiler for winter use.

There is one existing drying system with a capacity of 400 kW th for wood chips, sunflowers, corn, grain, e.g. and a new drying system with a capacity of 900 kW th for wood chips.

2 x wp3.250

Oct. 2024

500 kW

930 kW

Execution of peripherals and installations

Nahwärme Vorchdorf e.Gen.
AT / Upper Austria

District Heating Network & Green Electricity

In 2022, the expansion project of the heating plant, the new wood gas plant, was put into operation.

The heating plant in Vorchdorf supplies around 900 single-family homes with heat. The wood gas plant generates electricity for around 850 single-family homes.

3 x wp2.150

June 2022

480 kW

870 kW

Ă–ko Energie Zauner
AT / Upper Austria

Waste Disposal and Operation of District Heating Network

The company has been operating a biogas plant for years and is active in waste disposal, biomass drying and the production of organic fertilizers. The wood gas CHP system is in operation since June 2022.

The district heating network in the Pettenbach area has a connected load of > 3MW; the consumers are private households and commercial enterprises.

2 x wp2.150

June 2022

320 kW

580 kW

Reference system 300 kW
AT / Vorarlberg

Due to high demand for plants with higher output, the development of a wood gasifier with a combustion capacity of approx. 1 MW and a CHP with an electrical output of approx. 300 kW began in 2018. The prototype was commissioned in 2021.

From this development, the sizes wp3.250 and wp3.350 are available as standard in the meantime.

1 x wp2.300

February 2021

300 kW

600 kW

wp2.300_fechtig_1_en

2020
AT / Vorarlberg

Biomass Facility

2022 and 2019
CH / Montreux

Agriculture and Forestry

2019
DE / Bavaria

Eco Energy

2018
DE / Bavaria

Eco Energy

2018
AT / Vorarlberg

Brickwork Company

2018
DE / Black Forest

Woodwork Company

2017
DE / Allgäu

Agriculture and Forestry

2014
AT / Vorarlberg

Woodwork Company